• ide’s Latest Recruit

    ide’s Latest Recruit

    We have added yet another string to our bow within the Temporary Power Industry with the recruitment of Lance Brill. Lance, who originates out of Cape Town, South Africa is a fully qualified (17th Ed) electrical engineer, will be working within manufacturing and carrying out site work. Though he holds vast experience within the industry, Lance only emigrated to the UK in 2009…  lets just hope he can maintain with the English droll sense of humour.…

    Read more

    Categories: Company News

  • Extensive stocks of mains cable assemblies

    Extensive stocks of mains cable assemblies

    We have increased our stock of mains cable assemblies in  HO7RNF rubber and SY cable

    All cables from 240mm 1C HO7RNF terminated with lugs or Powerlock connectors to 3C SY cable terminated with 16A 230V plugs and couplers available for delivery on next day basis. Please call for latest prices 01543 574111…

    Read more

    Categories: Product updates

  • 2000A Temporary Electrical Distribution Assemblies

    2000A Temporary Electrical Distribution Assemblies

    Aerial shot of the workshop in full flow

    Our workshop Engineers are nearly over the finish line with another batch of 2000A Electrical Distribution boards nearing completion. These boards have a 2000A 4 pole main ACB as the incoming protection feeding 4 x 400A 4 pole MCCB’s. The assembly is manufactured to Form 4 Type 3 according to EN61439-2 with individual earth leakage relays and multi-function metering. Enclosed in a galvanised steel protective frame with fork lift pockets, certified lifting …

    Read more

    Categories: Product updates

  • ide Baby Boom

    ide Baby Boom

    There seems to be something in the water in Cannock.

     Matt, workshop foreman, and his wife Nikki welcomed the arrival of their daughter Olivia Rose on St Valentine’s day.

    We expect further arrivals as two more staff members are expecting babies in the coming months.

    We all wish the proud parents the very best for the future and not too many sleepless nights!!!…

    Read more

    Categories: Company News

  • ide London Expand

    ide London Expand

    Due to the increasing demand for Temporary Power Distribution and Cable in London and South, ide have expanded into larger premises at Thurrock enabling us to carry more of our 2012 £200’000 stock investment. For a solution to your Electrical Distribution requirements phone Phil or Dave at Thurrock on 01708 863 963…

    Read more

    Categories: Company News