• Extensive stocks of mains cable assemblies

    Extensive stocks of mains cable assemblies

    We have increased our stock of mains cable assemblies in  HO7RNF rubber and SY cable

    All cables from 240mm 1C HO7RNF terminated with lugs or Powerlock connectors to 3C SY cable terminated with 16A 230V plugs and couplers available for delivery on next day basis. Please call for latest prices 01543 574111…

    Read more

    Categories: Miscellaneous

  • 2000A Temporary Electrical Distribution Assemblies

    2000A Temporary Electrical Distribution Assemblies

    Aerial shot of the workshop in full flow

    Our workshop Engineers are nearly over the finish line with another batch of 2000A Electrical Distribution boards nearing completion. These boards have a 2000A 4 pole main ACB as the incoming protection feeding 4 x 400A 4 pole MCCB’s. The assembly is manufactured to Form 4 Type 3 according to EN61439-2 with individual earth leakage relays and multi-function metering. Enclosed in a galvanised steel protective frame with fork lift pockets, certified lifting …

    Read more

    Categories: Latest projects

  • ide Baby Boom

    ide Baby Boom

    There seems to be something in the water in Cannock.

     Matt, workshop foreman, and his wife Nikki welcomed the arrival of their daughter Olivia Rose on St Valentine’s day.

     We expect further arrivals as two more staff members are expecting babies in the coming months. 

    We all wish the proud parents the very best for the future and not too many sleepless nights!!!…

    Read more

    Categories: Miscellaneous

  • ide London Expand

    ide London Expand

    Due to the increasing demand for Temporary Power Distribution and Cable in London and South, ide have expanded into larger premises at Thurrock enabling us to carry more of our 2012 £200’000 stock investment. For a solution to your Electrical Distribution requirements phone Phil or Dave at Thurrock on 01708 863 963…

    Read more

    Categories: News

  • New 2012 Brochure on it’s way

    New 2012 Brochure on it’s way

    As it’s the start of a new year, we have began the arduous task of increasing our product range with a £200’000 investment in the rental fleet alone. The gents from manufacturing are dedicating some serious hours over the next month in preparation for a busy year. In addition, final photographs have been taken today for our new 2012 brochure, available early March!

    Read more

    Categories: Latest projects